Mesa College Child Development Center Roof

Project Schedule

Programming Complete Design and DSA Approval Construction Completion (Est.) FFE and Move-In (Est.)
08-01-2025 N/A 11-25-2025 N/A

Project Progress Update

Upcoming Milestones:

Project Description

Install a fluid-applied roofing restoration system over the existing roof surfaces for the San Diego Community College District Child Development Center (CDC) roof. Repair all defects, including deteriorated roof decking, saturated insulation, and loose or brittle membrane or membrane flashings. Verify that existing conditions meet the following requirements: the membrane must be fully adhered or, if mechanically attached, all fasteners must be secure and functional. Roofing materials shall not be applied over brittle membrane surfaces.

Conceptual Program Plan

Mesa College Child Development Center Roof

Project Map

Mesa College Child Development Center Roof

32° 48′ 14.53″ N, 117° 10′ 26.25″ W

Project News & Information

Additional resources, articles, and links related to this project will appear here when available. For comprehensive information about Measure HH and all ongoing projects, please explore the Measure HH website.

Project Teams

General Contractor The Garland Company, Inc
Architect Lance Lareau
Structural Engineer N/A
Civil Engineer N/A
Mech./ Elect. Engineer N/A
Executive Const. Manager Steve Evanco

 