Mesa College Coil Condenser Building G

Project Schedule

Programming Complete Design and DSA Approval Construction Completion (Est.) FFE and Move-In (Est.)
05-21-2025 TBD 11/30/2025 N/A

Project Progress Update

Upcoming Milestones:

Mesa College Coil Condenser Building G  Mesa College Coil Condenser Building G  Mesa College Coil Condenser Building G

Project Description

During an on-site visit to the Mesa G10 facility, an ACCO technician inspected the 130-ton Trane Chiller CH-1 and identified a failure in one of its circuits. Specifically, Circuit 1 was found to have a failed set of condenser coils. Based on this assessment, recommendations include replacing the four condenser coils associated with the affected circuit. The proposed scope of work includes the following steps: first, isolating Chiller 1, followed by recovering refrigerant from the failing circuit. The technician will then remove the fan sections as necessary to access the coils, rig out the old coils, and furnish and install four new OEM condenser coils for Circuit 1, brazing all required connections. After installation, the system will undergo a pressure test, then be recharged and reassembled. Finally, a system startup will be performed to verify proper operation

Conceptual Program Plan

Mesa College Coil Condenser Building G

Project Map

Mesa College Coil Condenser Building G

32° 48′ 14.53″ N, 117° 10′ 26.25″ W

Project News & Information

Additional resources, articles, and links related to this project will appear here when available. For comprehensive information about Measure HH and all ongoing projects, please explore the Measure HH website.

Project Teams

General Contractor ACCO Engineering
Architect Lance Lareau
Structural Engineer N/A
Civil Engineer N/A
Mech./ Elect. Engineer N/A
Executive Const. Manager Steve Evanco

 

Last updated: March 31, 2026