Mesa College Storm Drain Improvement
Project Schedule
| Programming Complete | Design and DSA Approval | Construction Completion (Est.) | FFE and Move-In (Est.) |
|---|---|---|---|
| 05/02/2025 | 8/21/2024 | 01/10/2026 | N/A |
Project Progress Update
Upcoming Milestones:
- 9-12-2025: Energy Dissipator form and pour wall & top of Rip Rap.
- 9-11-2025 to 9-24-2025: Backfill C1 Curb Inlet.
- 9-17-2025: Form curb and gutter.
- 9-24-2025: Backfill energy dissipater.
- 9-22-2025 to 9-24-2025: Rip Rap installation.
- 9-25-2025: Summit Erosion to start installation of Coconut Blanket at slope.
- 9-26-2025: AC paving work is scheduled to commence.
- 9-29-2025: Landscaping and irrigation system work to commence.
- 10-03-2025: Grind and overlay to start.
- 10-20-2025: Punch List items completed
- 10-31-2025: Final closeout items anticipated from Align builders.
- 01-19-2026: Landscape maintenance period end.
Kyne is expected to complete all slope grading, rip rap installation, and associated site preparation work by September 24. Following that, Summit Erosion will mobilize on September 25 to begin erosion control measures and is anticipated to complete their scope of work by September 26. Once those activities are finished, Broyles will mobilize on September 29 to begin work on the irrigation system installation. The project is currently on track to meet its scheduled completion date.
Project Description
This project focuses on enhancing the existing storm drain system located at the West End of the Mesa College campus. The current 18-inch corrugated steel pipe (CSP) system will be removed and replaced with an improved and efficient 20-inch high-density polyethylene (HDPE) pipe. The new storm drain system offers increased flow capacity and improved long-term performance.
In addition to the storm drain upgrade, this project includes the rehabilitation of slopes in the surrounding area in accordance with Geotechnical report. These areas will be reconstructed using native soil infill to restore the natural enhance slope.
Project Map

32° 48′ 14.53″ N, 117° 10′ 26.25″ W
Project News & Information
Additional resources, articles, and links related to this project will appear here when available. For comprehensive information about Measure HH and all ongoing projects, please explore the Measure HH website.
Project Teams
| General Contractor | Align Builders |
| Architect | Lance Lareau |
| Structural Engineer | N/A |
| Civil Engineer | Nasland Engineering |
| Mech./ Elect. Engineer | N/A |
| Executive Const. Manager | Steve Evanco |
Last updated: March 31, 2026